Transcription of DESIGN AND INSTALLATION GUIDE - Gastite
{{id}} {{{paragraph}}}
SEPTEMBER AND INSTALLATION GUIDEC ommercial I Industrial I ResidentialSECTION 1: INTRODUCTION / SEPTEMBER 2017 Important Lightning Safety Warning 1 PROPERLY BONDING and grounding the Corrugated Stainless Steel Tubing (CSST) system may reduce the risk of damage and fire fr om a lightning strike. Lightning is a highly destructive force. Even a nearby lightning strike that does not strike a structure directly can cause systems in the structure to become electrically energized. Differences in potential between systems may cause the charge to arc between systems. Such arcing can cause damage to CSST, including holes. Bonding and grounding should reduce the risk of arcing and related damage.
SECTION 1: INTRODUCTION / SEPTEMBER 2017Important Lightn ing Safety Warn g 1 PROPERLY BONDING and grounding the Corrugated Stainless Steel Tubing (CSST) system may reduce the risk of damage and fire from a lightning
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Section, For a specific, ARTICLE I GENERAL SECTION 100. PURPOSE, 3 PROPERTY ANALYSIS, Property analysis, Specific, City Department of Housing Preservation and, Sound, Business Case for Active Transportation, LI I, ASCD, FishElite 502C iGPS & SeaCharter 502C, FishElite 502c iGPS & SeaCharter, Wildfowl Bay, MICHIGAN DEPARTMENT OF NATURAL RESOURCES