Transcription of Development of Prototype Highway Asset …
{{id}} {{{paragraph}}}
JOURNAL OF INFRASTRUCTURE SYSTEMS / JUNE 1999 /61 Development OFPROTOTYPEHIGHWAYASSETMANAGEMENTSYSTEMB y Nasir G. Gharaibeh,1 Michael I. Darter,2 Member, ASCE,and donald R. Uzarski,3 Member, ASCEABSTRACT:A Prototype methodology for integrating Highway infrastructure management activities has beendeveloped. This paper describes the analytical procedures and data integration and presentation methods as wellas the geographic information system - (GIS-) based software system that ties together and implements the dataand management procedures. Together these elements comprise the new methodology. There are four majorareas of integration considered in the methodology: (1) Integrated computerized system ; (2) network-level in-tegration; (3) project-level integration; and (4) multiple performance measures.
JOURNAL OF INFRASTRUCTURE SYSTEMS / JUNE 1999 / 61 DEVELOPMENT OF PROTOTYPE HIGHWAY ASSET MANAGEMENT SYSTEM By Nasir G. Gharaibeh,1 Michael I. Darter,2 Member, ASCE, and Donald R. Uzarski,3 Member, ASCE ABSTRACT: A prototype methodology for integrating highway infrastructure …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
ANALYSIS, Donald, Economic Development Terms, Economic Analysis, VB Marketing & Pricing III, Analysis of CO2 Capture Using Algae, Handbook of Acoustical Measurements and Noise, Handbook of Acoustical Measurements and Noise Control, Steel-concrete composite bridge design guide, Understanding ethical decision-making, University of North Florida, 3.01 Human Resource Management