Transcription of DIVISION 1 GENERAL DATA - …
{{id}} {{{paragraph}}}
DIVISION 1 GENERAL DATA 01010 -1 section 01010 summary of work PART 1 GENERAL section INCLUDES A. Description of Existing Facilities B. GENERAL Scope of work C. Contractor s Responsibilities D. System Operations E. work Sequence F. Owner Occupancy G. Contract Documents DESCRIPTION OF EXISTING FACILITIES The existing Rosedale Wastewater Treatment facility consists of a 122,000 gpd (average) extended aeration package plant, chlorination (chlorine gas), dechlorination (sulfur dioxide), parshall flume metering structure and post aeration. The existing site also includes sludge drying beds, sludge holding tank, sludge transfer station, lab building and chemical building.
01010-1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Existing Facilities B. General Scope of Work
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}