PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bankruptcy

DIVISION 1 - GENERAL REQUIREMENTS

DIVISION 1 GENERAL REQUIREMENTS UMN, Facilities Management Last Revised: September 2019 Page 1 of 29 DIVISION 1 - GENERAL REQUIREMENTS 01000 - GENERAL REQUIREMENTS 1. The following items apply to DIVISION 1 specification sections: The A/E shall prepare Section 01010, Summary of Work, and other DIVISION 1 sections required by specific project conditions. For eligible, appropriate projects, the A/E shall use the specifications that form part of the annual contract, supplementing those specifications with additional specification sections and keynotes on the construction drawings.

to be performed adjacent to or in the immediate vicinity of existing structures, contact the owner’s representative to determine if the building surveys and seismic monitoring are required. 2.2. Records of the pre-construction survey shall note pre -construction defects, measurements, elevations and newly discovered defects or changes.

Loading..

Tags:

  Seismic, Construction, Division, Structure, Division 1

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of DIVISION 1 - GENERAL REQUIREMENTS

Related search queries