Transcription of ELECTRICAL SAFETY PROCEDURE - Tata Power
{{id}} {{{paragraph}}}
The Tata Power Company Ltd Document Title ELECTRICAL SAFETY PROCEDURE Document Ref No. TPSMS/CSP/ELEC/010 Rev 01 Date of Issue: 01/01/2016 Note: Uncontrolled once printed Page 1 of 33 ELECTRICAL SAFETY PROCEDURE Rev No. Reason for Revision Prepared By Checked By Approval by Rev 00 Initial Release Ali Mohammed Zulphekari Navendra Singh Shrinivas Katti Rev 01 To align with Tata Group SAFETY Standard Ali Mohammed Zulphekari (Team Lead - QA,I&T) Navendra Singh (Group Head P Corp SAFETY .) Vijay Chourey (Chief Corp SAFETY ) The Tata Power Company Ltd Document Title ELECTRICAL SAFETY PROCEDURE Document Ref No. TPSMS/CSP/ELEC/010 Rev 01 Date of Issue: 01/01/2016 Note: Uncontrolled once printed Page 2 of 33 Contents Section Description Page No.
6.1.6 All electrical work shall be done in compliance to Standard Operating Procedure (SOP)/ Standard Maintenance Procedure (SMP). 6.1.7 Checklist should be made available and filled up copies recorded. 6.1.8 Isolation and subsequent confirmation test shall be carried out to verify absence of voltage.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Packaging Standard Operating Procedure, Standard Operating Procedure, Packaging, Safe, LABORATORY STANDARD OPERATING, Laboratory SOP, LABORATORY STANDARD OPERATING PROCEDURES, Operating, Standard operating procedure Transition to recovery, Standard operating procedures, Standard Operating Procedure SOP, Standard Operating, Standard Operating Procedure (SOP) Chainsaws, Procedure