Transcription of Guidelines for Pipe Bursting - Trenchless
{{id}} {{{paragraph}}}
Guidelines for pipe Bursting TTC Technical Report # Jadranka Simicevic Raymond L. Sterling Prepared for: Army corps of Engineers Engineering Research and Development Center (ERDC). 3909 Halls Ferry Road Vicksburg, MS 39180. March 2001. DISCLAIMER. This report was prepared by the Trenchless Technology Center (TTC) for the Army corps of Engineers, Engineering Research and Development Center (ERDC). Neither TTC, the Army corps of Engineers, nor any person acting on their behalf, makes a warranty, express or implied, with respect to the use of any information, apparatus, method, or process disclosed in this report or that such use may not infringe on privately owned rights; or assumes any liabilities with respect to the use of, or for damages resulting from the use of, any information, apparatus, method, or process disclosed in this report.
D ISCLAIMER This report was prepared by the Trenchless Technology Center (TTC) for the U.S. Army Corps of Engineers, Engineering Research and …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
HUNTINGTON DISTRICT, CORPS OF ENGINEERS, States army corps of engineers, Federal energy regulatory commission, Corps, CORPS OF ENGINEERS, Army Corps of Engineers Circular No, Corps$of$Engineers, U.S.$Army$Corps$of$Engineers$ Air$Leakage$Test$Protocol$for$ Building$Envelopes$ Version3$A$May$11, CIVIL ENGINEER CORPS 510X, United States Navy