PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: marketing

HA 74/07 - Standards for Highways

DESIGN MANUAL FOR ROADS AND BRIDGES. VOLUME 4 GEOTECHNICS AND. DRAINAGE. SECTION 1 EARTHWORKS. PART 6. HA 74/07 . TREATMENT OF fill AND capping . MATERIALS using either LIME OR. CEMENT OR BOTH. SUMMARY. This Advice Note provides guidance on the use of lime and cement to stabilise capping materials for highway works and slope repairs. The guidance covers site investigation, design and construction INSTRUCTIONS FOR USE. 1. This document supersedes HA 74/00, which is now withdrawn. 2. Remove HA 74/00, which is superseded by HA 74/07 and archive as appropriate. 3. Insert HA 74/07 in Volume 4, Section 1, Part 6. 4. Please archive this sheet as appropriate. Note: A quarterly index with a full set of Volume Contents Pages is available separately from The Stationery Office Ltd.

HA 74/07 Volume 4, Section 1, Part 6 Treatment of Fill and Capping Materials Using Either Lime or Cement or Both Summary: This Advice Note provides guidance on the use of lime and cement to stabilise

Loading..

Tags:

  Using, Material, Fill, Either, Capping, Fill and capping materials using either

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of HA 74/07 - Standards for Highways

Related search queries