Transcription of HA 74/07 - Standards for Highways
{{id}} {{{paragraph}}}
DESIGN MANUAL FOR ROADS AND BRIDGES. VOLUME 4 GEOTECHNICS AND. DRAINAGE. SECTION 1 EARTHWORKS. PART 6. HA 74/07 . TREATMENT OF fill AND capping . MATERIALS using either LIME OR. CEMENT OR BOTH. SUMMARY. This Advice Note provides guidance on the use of lime and cement to stabilise capping materials for highway works and slope repairs. The guidance covers site investigation, design and construction INSTRUCTIONS FOR USE. 1. This document supersedes HA 74/00, which is now withdrawn. 2. Remove HA 74/00, which is superseded by HA 74/07 and archive as appropriate. 3. Insert HA 74/07 in Volume 4, Section 1, Part 6. 4. Please archive this sheet as appropriate. Note: A quarterly index with a full set of Volume Contents Pages is available separately from The Stationery Office Ltd.
HA 74/07 Volume 4, Section 1, Part 6 Treatment of Fill and Capping Materials Using Either Lime or Cement or Both Summary: This Advice Note provides guidance on the use of lime and cement to stabilise
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}