Crown copyright 2002 Broad Lane, Sheffield, S3 7 HQTelephone: +44 (0)114 289 2000 Facsimile: +44 (0)114 289 2500 Risk Based Inspection -A Case Study Evaluation of Onshore Process PlantHSL/2002/20W Geary PhD MIM CEngProject Leader: W GearyEngineering Control GroupSummary Objectives Risk Based Inspection (RBI) as a method for prioritising the Inspection of plant has receivedconsiderable attention over the last few years and methods have been developed nationally,for example by the American Petroleum Institute (API) and by a number of privateorganisations, particularly in the petrochemical industry. A co-ordinated approach to thesedevelopments is currently underway in Europe (RIMAP). A survey of approximately 50 UK organisations carried out by HSL in 1999 showed thatapproximately half were using an approach to plant Inspection Based on risk.
Summary Objectives Risk based inspection (RBI) as a method for pr ioritising the inspection of plant has received considerable attention over the last few years and methods have been developed nationally,
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}