Transcription of INSTALLATION AND MAINTENANCE …
{{id}} {{{paragraph}}}
D100-50-00 Pittway Tecnologica , Via Caboto 19/3, 34147 Trieste, ItalyI56-2632-0061 TESTINGD etectors must be tested after INSTALLATION and following periodic , before testing, notify the proper authorities that the smoke detector systemis undergoing MAINTENANCE and the system will be temporarily out of the zone or system undergoing MAINTENANCE to prevent unwanted : If testing is carried out using non-intrinsically safe methods, itmust be conducted outside the hazardous the detector as follows:Test Magnet (Model M02-04-00 - optional) the detector by positioning the test magnet against the detector body approximately 2cm from LED1 in the direction of themetering socket (see Figure 1).
D100-50-00 1 Pittway Tecnologica S.r.l., Via Caboto 19/3, 34147 Trieste, Italy I56-2632-006 TESTING Detectors must be tested after installation and …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}