PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: tourism industry

INSTALLATION AND MAINTENANCE …

5100 North IH 35 Round Rock, Texas 78681 Phone: 800-451-8798 512-255-4141 Fax: 512-244-5512 INSTALLATION ANDMAINTENANCE INSTRUCTIONSFOR THREE PHASEINDUCTION MOTORSF rames 56 and 143T - 449 TZRECEIVING1. Check nameplate Check whether any damage has occurred during After removal of shaft clamp, turn shaft by hand to check that it turns If motor is to be reshipped (alone or installed to another piece of equipment) the shaft must againbe clamped to prevent axial : Remove the bearing clamp before turning the shaft on 284T-449TZ frame FOLLOWING SAFETY PRECAUTIONS MUST BE OBSERVED:1. Electric rotating machinery and high voltage can cause serious or fatal injury if improperlyinstalled, operated or maintained. Responsible personnel should be familiarized withNEMA MG-1; Safety Standards for Construction and Guide Selection. INSTALLATION and Use ofElectric Motors and Generators; National Electric Code and all local safety When servicing, all power sources to the motor and to the accessory devices should bede-energized and disconnected and all rotating parts should be at Lifting means, when supplied, are intended for lifting the motor only.

5100 North IH 35 Round Rock, Texas 78681 Phone: 800-451-8798 512-255-4141 Fax: 512-244-5512 INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR …

Loading..

Tags:

  Installation

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of INSTALLATION AND MAINTENANCE …

Related search queries