Transcription of Installation and Operational Qualification Protocol ...
{{id}} {{{paragraph}}}
TEM-270 Issue date Installation and Operational Qualification Protocol (Reference: SOP _____) Page 1 of 18 Project Name Project Number Equipment Serial Number Manufacturer Model Number Process Line/Location Protocol number WRITTEN BY: REVIEWED BY: Name: Position Signature: Date: APPROVAL TO EXECUTE: Name: Position: Signature: Date: Protocol COMPLETION APPROVAL: Name: Position: Signature: Date: 1 OBJECTIVE The objective of this Protocol is to define the Installation Qualification (IQ) and Operational Qualification (OQ) requirements and acceptance criteria for the [insert system name and plant number] which will be located in the [insert area, packaging or manufacturing] at site [insert site name]. IQ/OQ is required as [insert brief description as to why required, as it is new equipment. Successful completion of this Protocol will provide a high degree of assurance that the equipment has been installed and operates in accordance with the site requirements, specifications and manufacturers recommendations and is in compliance with cGMP and site policies.]
The objective of this protocol is to define the Installation Qualification (IQ) and Operational Qualification (OQ) requirements and acceptance criteria for the [insert system name and plant number] which will be located in the [insert area, packaging …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}