Transcription of Installation and Service Instructions
{{id}} {{{paragraph}}}
Installation and ServiceInstructionsVITODENS 100-W5600 332 - 13 02/2019for use by heating contractorVitodens 100-W WB1B Series Wall-Mounted, gas-fired condensing boilerwith optional on demand hot water CombiPLUS KitRead and save these instructionsfor future file in Service BinderHeating input 37 to 118 MBH to kWVitodens 100-W, WB1B (with pre-installed coaxial vent pipe adaptor)and with CombiPLUS Kit 332 - 13 Vitodens 100-W, WB1B CombiPlus Installation & Service Safety, Installation and Warranty RequirementsSafetyPlease ensure that these Instructions are read and understood before commencing Installation . Failure to comply with the Instructions listed below and details printed in this manual can cause product/property damage, severe personal injury, and/or loss of life. Ensure all requirements below are understood and fulfilled (including detailed information found in manual subsections).WARNINGI nstallers must follow local regulations with respect to Installation of carbon monoxide detectors.
Fixed High Limit fault simulation method #2: • Throttle the boiler valve to a point where the burner will run with as little flow as possible. • Run the boiler to high fire via relays test. • When the burner shuts down on the electronic limit, close the ball valve to stop the flow.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}