Transcription of Installation Guide Energy Meter with Modbus Connection
{{id}} {{{paragraph}}}
Installation GuideEnergy Meter with Modbus ConnectionVersion NoticeCopyright SolarEdge Inc. All rights part of this document may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photographic, magnetic or otherwise, without the prior written permission of SolarEdge material furnished in this document is believed to be accurate and reliable. However, SolarEdge assumes no responsibility for the use of this material. SolarEdge reserves the right to make changes to the material at any time and without notice. You may refer to the SolarEdge web site ( ) for the most updated company and brand products and service names are trademarks or registered trademarks of their respective marking notice: see The general terms and conditions of delivery of SolarEdge shall content of these documents is continually reviewed and amended, where necessary.
The meter communicates with the inverter/Commercial Gateway over an RS485 connection. Refer to the connection diagram below. If you are connecting two meters, refer to Installing Two Meters on page 57. Figure 8: Meter connections NOTE Clamp the CT connected to L1 CT around the wire connected to ØL1. Clamp the CT connected to L2 CT around the wire
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}