Transcription of Installation Operation Maintenance - Trane
{{id}} {{{paragraph}}}
InstallationOperationMaintenanceSplit System Heat Pump Condensers7 1/2 - 20 TonsFebruary 2004 Models:(60 Hz)TWA090A**FTWA120A**FTWA180B**FTWA240B **FTWA-SVX01A-EN18-BC60D5(50 Hz)TWA075AD**FTWA100AD**FTWA155BD**FTWA2 00BD**F2 TWA-SVX01A-ENIntroductionLiterature Change HistoryTWA-SVX01A-EN (May 2003)Compressor ChangesTWA-SVX01A-EN (January 2004)Compressor LRA of ManualNote: One copy of this documentships inside the control panel ofeach unit and is customerproperty. It must be retained bythe unit s Maintenance booklet describes properinstallation, Operation , and maintenanceprocedures for air cooled systems. Bycarefully reviewing the information withinthis manual and following theinstructions, the risk of improperoperation and/or component damagewill be is important that periodic maintenancebe performed to help assure trouble freeoperation.
data to insure the proper unit was shipped. Available power supply must be compatible with electrical characteristics specified on component nameplates. Replace damaged parts with authorized parts only. Inspection Checklist To protect against loss due to damage incurred in transit, complete the following checklist upon receipt of the unit.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}