Transcription of Installer's Guide - Upflow/Horizontal and Downflow ...
{{id}} {{{paragraph}}}
1 8 - CD1 9 D5 - 2 5. Installer's Guide Upflow/ Horizontal and Downflow / Horizontal Gas-Fired Condensing Furnaces *UC1B040A9241A *UC1D100A9601A *DC1B080A9421A. *UC1B060A9361A *UC1D120A9601A *DC1C100A9481A. *UC1B080A9421A *DC1B040A9241A *DC1D120A9601A. *UC1C100A9481A *DC1B060A9361A. *__First letter may be A or T . ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES. IMPORTANT This Document is customer property and is to remain with this unit. Please return to service information pack upon completion of work. *UC1 *DC1. Downflow . UPFLOW. UPFLOW/ HORIZONTAL Downflow / HORIZONTAL. A341624P01. Installer's Guide SAFETY SECTION f. The furnace return air temperature range is between 55 and 80 degrees Fahrenheit. The following safety practices and precautions must be g. Clean the furnace, duct work, and components followed during the installation, servicing, and opera- upon substantial completion of the construction tion of this furnace.
connected to the venting system being placed into op-eration, while all other appliances connected to the vent-ing system are not in operation: 1. Seal any unused openings in the venting system. 2. Inspect the venting system for proper size and hori-zontal pitch, as required in the National Fuel Gas Code, ANSI Z223.1/ NFPA 54 or the CAN/ CGA B149
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}