Transcription of Integrated Product Support Procedures
{{id}} {{{paragraph}}}
Department of the Army Pamphlet 700 127 logistics Integrated Product Support Procedures Headquarters Department of the Army Washington, DC 28 September 2016 UNCLASSIFIED SUMMARY of CHANGE DA PAM 700 127 Integrated Product Support Procedures This mandated revision, dated 28 September 2016-o Adds guidance for special tools (para 8-6).o Incorporates guidance from Army Directive 2016-12 (para 8-6).Headquarters Department of the Army Washington, DC 28 September 2016 Department of the Army Pamphlet 700 127 logistics Integrated Product Support Procedures History. This publication is a mandated revision. The portions affected by this mandated revision are l isted in the summary of the change.
Configuration management • 7–2, page 51 Logistics product data • 7–3, page 51 Provisioning technical documentation • 7–4, page 53 Equipment publications • 7–5, page 53 Maintenance allocation chart • 7–6, page 53 Operator manuals • 7–7, page 54 Maintenance manuals ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}