Investigation of March 15, 2018 Pedestrian Bridge Collapse ...

Investigation of March 15, 2018 Pedestrian Bridge Collapse at Florida International University, Miami, FL Department of Labor Occupational Safety and Health Administration Directorate of Construction July 2019 Investigation of March 15, 2018 Pedestrian Bridge Collapse at Florida International University, Miami, FL 2 REPORT Investigation of March 15, 2018 Pedestrian Bridge Collapse at Florida International University, Miami, FL July 2019 Report prepared by Mohammad Ayub, PE, SE Director, Office of Engineering Services Directorate of Construction OSHA National Office Washington, Investigation of March 15, 2018 Pedestrian Bridge Collapse at Florida International University, Miami, FL 3 TABLE OF CONTENTS PAGE NO. 1. Executive Summary:*.. 9 2. Introduction: .. 13 3. Key Participants:.. 16 4. Description of Construction: .. 18 5. Peer review:** .. 36 6. The cracks.

constructed next over the canal to make a continuous bridge of 289 feet. The concrete bridge was cast at a nearby off-site location using what is known as Accelerated Bridge Construction (ABC) and then transported to its final location. ABC provides minimal traffic disruption. The

Tags:

  Cast, Continuous

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Investigation of March 15, 2018 Pedestrian Bridge Collapse ...

Related search queries