Transcription of MCHW VOLUME 3 SECTION 1 - HIGHWAY …
{{id}} {{{paragraph}}}
VOLUME 3 HIGHWAY construction detailshighway construction detailsamendment november 2008summaryThis document contains the replacement pages and drawings for incorporation into the HIGHWAY construction for use1. Insert the replacement pages and drawings listed on the Amendments sheet (Amendment - November 2008), remove the corresponding existing pages and drawings, which are superseded by this amendment, and archive as appropriate. (Advice on archiving is given in Standard SD 0/08)2. Insert the latest Amendments sheet dated November 2008 at the front of the Enter details of Amendment - November 2008 on the Registration of Amendments sheet, sign and date to confirm that the amendment has been Archive this sheet as : A quarterly index with a full set of VOLUME Contents Pages is ava
manual of contract documents for highway works amendment - november 2008 to volume 3 - highway construction details Replace existing pages: i/ii and vii/viii with new pages i/ii and vii/viii
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
STANDARD HIGHWAY SPECIFICATIONS VOLUME, Standard highway specifications volume ii, STANDARD HIGHWAY SPECIFICATIONS, Highway Specifications, Volume, Highway, Method of measurement for highway works, Municipal corporation of greater mumbai, Specifications, Barber Book New Section 5, Standard, STANDARD CONSTRUCTION SPECIFICATIONS