Transcription of MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION
{{id}} {{{paragraph}}}
Checked: SGJ Date: June 2012 FHPP FHPP Hepton Court, York Road, Leeds, LS9 6PW June 2012 MECHANICAL AND ELECTRICAL TECHNICAL SPECIFICATION for the Replacement Chiller Works at Prepared by Checked: SGJ Date: June 2012 FHPP Revision Date Details Author Checked - June 12 Tender Issue MA SGJ Checked: SGJ Date: June 2012 FHPP INDEX SECTION DESCRIPTION PAGE No SECTION - Introduction .. 1 SECTION - General Requirements .. 3 SECTION Scope of Works .. 19 SECTION Enabling Works.
chilled water for the cooling coils in numerous air handling units that serve the VAV system ... Further works will also include for the refurbishment of the existing Motor Control Centers (MCCA & MCCB) as described in a later section of this specification. ... (97/23/EC) • Safety Code for Mechanical Refrigeration (EN378-2 (2008))
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}