Transcription of Method Statement: Testing Dry Riser System - …
{{id}} {{{paragraph}}}
Scope of work Test dry Riser System in accordance with BS 5306. Definitions For the purposes of this document, the following definitions apply Rising Mains A vertical pipe installed in a building for the fire fighting purposes, fitted with inlet connections at Ground Level, and outlet valves at specified points, which is normally dry but capable of being charged with water, usually by pumping from a fire Service appliance. Landing Valve An assembly comprising a valve and outlet connection from a wet or dry Riser . Inlet Breeching An assembly comprising inlet connections and a drain valve, normally fitted within an inlet box.
Scope of work Test dry riser system in accordance with S 5306. Definitions For the purposes of this document, the following definitions apply – Rising Mains A vertical pipe installed in a building for the fire fighting purposes, fitted with inlet connections at
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Report, Test, SAMPLE TESTING/INSPECTION LETTER, Test Procedure to Evaluate Fluids in, Backflow preventer forward flow test, BACKFLOW PREVENTER FORWARD FLOW TEST PROCEDURES, American Water, American Petroleum Institute Guide to Reporting, Supervision of Bulk Oil Storage, Electrostatic Liquid Cleaning does efficiently