Transcription of Note 983612 - SAP Project System Integration …
{{id}} {{{paragraph}}}
1 of 6 Note 983612 -SAP Project System Integration with SAP xRPM Language: EnglishVersion: 2 Validity: Valid from related to SAP Project System (release 46C onwards) Integration with SAP xRPM TermsSAP xRPM , SAP Project System Integration , SAP Project SystemUpload/DownloadCause and PrerequisitesThis note provides recommendations for SAP Project System Upload andDownload to/from SAP xRPM and is applicable for the customers with ServicePackage 7 of SAP xRPM and SAP Project System release 46C Pre-requisites for Project System Integration - There should exist an Item in xRPM which is not linked to any Project inBase Project There should exists a cProjects Project (referred to as "OperationalProject") attached to the Basic configuration steps should have been carried in SAP xRPM IMG andcProjects ConfigurationIt is necessary that all the required configurations to create theseobjects have been carried upon before the Integration takes place.
20.11.2007 Page 2 of 6 Note 983612 - SAP Project System Integration with SAP xRPM 4.0 the fields that are available from cProjects Project. For example, to review the Project Header Mapping of PS Project and
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}