Transcription of NPCC Regional Reliability Reference Directory # 4 …
{{id}} {{{paragraph}}}
This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the npcc website for the current CONTROLLED version of this document. i npcc Regional Reliability Reference Directory # 4 Bulk Power System Protection Criteria Task Force on System Protection Revision Review Record: December 1st, 2009 September 30th, 2015 Adopted by the Members of the Northeast Power Coordinating Council, Inc. December 01, 2009 based on recommendation by the Reliability Coordinating Committee, in accordance with Section VIII of the npcc Amended and Restated Bylaws dated July 24, 2007 as amended to date. ii Revision History Version Date Action Change Tracking (New, Errata or Revisions) 0 12/01/2009 New 1 3/31/2015 Inserted Applicability of npcc Criteria 2 9/30/2015 TFSP Revisions Revisions npcc Reliability Reference Directory # 4 Bulk Power System Protection Criteria This document, when downloaded or printed, becomes UNCONTROLLED.
Guidance for consideration in the implementation of these criteria is provided in Appendix A, and the procedure for reviewing new and modified protection systems is provided in Appendix B.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Appendix B—Transmission Line and Substation, Appendix B—Transmission Line and Substation Components, FUNCTIONAL SPECIFICATIONS OF HVAC, FUNCTIONAL SPECIFICATIONS OF HVAC TRANSMISSION LINE, Oregon Solar Photovoltaic Project Appendix, Oregon Solar Photovoltaic Project Appendix A Technical Specification, Cooper Industries, Line, Solar Plant Dynamic, Solar Plant Dynamic Modeling Guidelines, Practical guide to earth resistance testing