Transcription of Number: 195 - iapmoes.org
{{id}} {{{paragraph}}}
number : 195 Originally Issued: 06/01/2011 Revised: 06/24/2020 Valid Through: 06/30/2021 The product described in this Uniform Evaluation Service (UES) Report has been evaluated as an alternative material, design or method of construction in order to satisfy and comply with the intent of the provision of the code, as noted in this report, and for at least equivalence to that prescribed in the code in quality, strength, effectiveness, fire resistance, durability and safety, as applicable, in accordance with IBC Section This document shall only be reproduced in its entirety.
Number: 195 Originally Issued: 06/01/2011 Revised: 07/11/2018 Valid Through: 06/30/2019 Page 2 of 3 2.12 Installation of foam-plastic-core roof panels shall be in
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
High-Efficiency Water Heater Ready, California Building, Applicable, Plumbing Plan Review Checklist - General, PLUMBING PLAN REVIEW CHECKLIST GENERAL, BUILDING, Multi-Directional Bracing ForElectrical Conduit,, Multi-Directional Bracing ForElectrical Conduit, Cable, Disaster Preparedness: Concepts, Guidance, and, Number: 309, ESR 2713, ESR-2713