PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: dental hygienist

NX-8E Control Panel Installation Manual

P/N I-NX8E-IM REV C ISS NOV12 NX-8E Control Panel Installation Manual Copyright 2012 UTC Fire & Security Americas Corporation, Inc. Interlogix is part of UTC Climate Controls & Security, a unit of United Technologies Corporation. All rights reserved. This document may not be copied in w hole or in part or otherw ise reproduced w ithout prior w ritten consent f rom UTC Fire & Security except w here specifically permitted under US and international copyright law . Disclaim er The inf ormation in this document is subject to change w ithout notice. UTC Fire & Security assumes no responsibility f or inaccuracies or omissions and specif ically disclaims any liabilities, losses, or risks, personal or otherw ise, incurred as a consequence, directly or indirectly, of the use or application of any of the contents of this document.

Chapter 1: Reporting codes NX-8E Control Panel Installation Manual 3 Board installation Inside the metal enclosure, there are slots for board insertions. These allow the PC board to be positioned vertically (Figure 2 below). When you slide the board between the grooves of the slots, make sure the terminal strip is toward the front

Loading..

Tags:

  Manual, Chapter, Manual 3

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of NX-8E Control Panel Installation Manual

Related search queries