Transcription of Ordering Information - American Trucking …
{{id}} {{{paragraph}}}
2015 Industry reference GuIdeR-69A Guide to TMC recommended Practices *Will appear in TMC s 2015 recommended Practices Manual 101B Heavy-Duty Truck Alternator Mounting Dis-cusses location and installation procedures and mounting material selection for maximum charging system life. Procedure covers mount-ing bracket, adjusting strap, pulleys, bushings, and associated hardware. Also describes alter-nator mounting maintenance 105C Battery Cable Assemblies Gives recommen-dations for proper selection and installation of battery cables to obtain maximum cranking circuit performance. This RP covers battery cables, terminals, heat shielding, grounding techniques, wire gauge, and replacement wire 106 6-Volt vs. 12-Volt Battery Study Discusses the relative merits of 6-volt vs.
2015 INDUSTRY REFERENCE GUIDE R-69 A Guide to TMC Recommended Practices *Will appear in TMC’s . 2015 Recommended Practices Manual Supplement. ELECTRICAL- S.1. RP 101B Heavy-Duty Truck Alternator Mounting — Dis-
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Recommended Practice and Procedure for, Practice, Rules of practice and procedure, API Recommended Practice 2A-WSD, API Recommended Practice 2D, Dropped Object Prevention Scheme, Dropped Object Prevention Scheme Recommended Practice, Service — Recommended Practices for Central, Service — Recommended Practices for Central Sterile, Recommended Procedure