Transcription of Paving Checklist Version 2.3 November 2015
{{id}} {{{paragraph}}}
Paving Checklist District: Contract Number: Residency: Contractor: Route: Paving Date: From Location: HMA Mix Type: To Location: Thickness/Application Rate: Pavement Surface Activities: Activity Yes/No Reference Surface Defects/Potholes/Reflectors/Raised Pavement Markers Repaired? Contract Documents Nuclear Gauge Calibrated? VTM 76 Ruts Filled In or Milled? Contract Documents Thermoplastic Removed? Traffic Loops and Sensor Addressed? Contract Documents Ride Data Provided to Contractor? (If applicable) SP for Rideability Pre- Paving Activities: Activity Yes/No Measurement Reference Is traffic maintained and protected in accordance with the Contract Documents and MOT plan if applicable? Section Pavement Surface to be Milled? Section 515 If Yes, Surface Milled to Proper Depth? Inches Section (b) Scabbing Removed? Section (b) Surface Clean? Section (b) Surface Texture Less Than mm MTD? Inches SP for Planing AC Pavement If No, Existing Surface Clean and No Puddled Water?
Paving Cheat Sheet – Supplement Asphalt resurfacing is done over long linear distances with imprecise information and sometimes inconsistent qualities of the existing conditions uncovered during milling and paving.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Asphalt Paving Safety, Asphalt Paving Safety Safety, Asphalt paving, Facts About Roofing Asphalt Fumes and Health, Paving, Asphalt, EZ STREET Asphalt, EZ STREET Asphalt Safety, Asphalt Industry A Global Perspective Final, Asphalt Industry – A Global Perspective, Mix Asphalt (WMA) Guide Specification, Mix Asphalt (WMA) Guide Specification for Highway Construction, Guideline for the design & construction, Petromat Installation Manual