PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: dental hygienist

PRECAST CONCRETE PIPE

PRECASTCONCRETE PIPEWHY PROVIDEGUIDELINES? Past problems. Was tedious to keep track of variables. Was easy to make mistakes. Wanted a design tool to Minimum Structure Size. Maximum Angle into RectangularStructures. Minimum Angle between Pipes enteringRound Structures. Minimum pipe SIZE The PRECAST opening is typically 6 incheslarger than the pipe s outside 4-2ofStorm Drain HandbookAugust 2000 Values based on Openings for CONCRETE PipeMINIMUMSTRUCTURE SIZEM inimum DimensionsFor StructuresMaximum Angle (Skew) into aRectangular StructureMAXIMUM ANGLE (SKEW)INTO A RECTANGULAR STRUCTURE12 PRECAST Opening6 OD Pipe60 PRECAST Opening54 OD Pipe6 StructureWallStructure WallGood practice to allow 2" ofcontruction yRODPipeCos= CosODPipeR=RTolerance = PRECAST Opening R yMAXIMUM ANGLE (SKEW)INTO A RECTANGULAR STRUCTUREE xample:Given.

TOPICS • Minimum Structure Size. • Maximum Angle into Rectangular Structures. • Minimum Angle between Pipes entering Round Structures. • Minimum Pipe Depth.

Tags:

  Concrete, Pipe

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of PRECAST CONCRETE PIPE

Related search queries