Transcription of PREPARING FOR INSTALLATION
{{id}} {{{paragraph}}}
BFRPF 3 2018 Pella CorporationRevised 04/16/2018 YOU WILL NEED TO SUPPLY:TOOLS REQUIRED: Moisture Resistant shims/spacers Fasteners (see block frame anchor instructions and tables at the end of this booklet) Closed cell foam backer rod/sealant backer Pella SmartFlash foil backed butyl window and door flashing tape or equivalent Low expansion, low pressure polyurethane insulating window and door foam sealant DO NOT use high pressure or latex foams. Pella Window and Door INSTALLATION Sealant or equivalent high quality, multi-purpose sealant Tape measure Level Square Hammer Scissors or utility knife Small flat blade screwdriver Sealant Gun Screw Gun with a Phillips Driver bit 1/8" Allen wrenchSEALANTSEALANTTWO OR MORE PEOPLE WILL BE REQUIRED FOR THE WINDOW WINDOWS IN UPRIGHT POSITION, OUT OF DIRECT Remove plastic wrap and cardboard packaging from the window.
BFRPF – 3 Revised 04/16/2018 © 2018 Pella Corporation YOU WILL NEED TO SUPPLY: TOOLS REQUIRED: • Moisture Resistant shims/spacers • Fasteners (see block frame anchor instructions and tables at the end of this booklet)
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
PREPARING A WORK AREA PREPARING YOUR, Screen Printing, PREPARING A WORK AREA, Work area, Preparing for Survey Readiness, Area, Your, Your area, Preparing for an, Work, Preparing for the WorkKeys Assessments, Quality Work-Based Learning Toolkit, Preparing, Special Education Mediation and, Special Education Mediation and Resolution Sessions, Steps in Implementing a Kaizen Event