Note: Uncontrolled once printed Page 1 The Tata Power Company Ltd MATERIAL HANDLING and STORAGE PROCEDURE Document No. TPSMS/GSP/HAZM/003 REV 01 Date of Issue: 30/06/2016 Rev No. Reason for Revision Prepared By Checked By Approval by Rev 00 First release R&P Subcommittee D Kamath Vijay Chourey Rev 01 Standardization of PROCEDURE Navendra Singh (Group Head P Corp Safety.) Rajesh Sharma ( Head Corp Safety Operation) Vijay Chourey (Chief Corp Safety) PROCEDURE FOR MATERIAL HANDLING AND STORAGE Note: Uncontrolled once printed Page 2 The Tata Power Company Ltd MATERIAL HANDLING and STORAGE PROCEDURE Document No. TPSMS/GSP/HAZM/003 REV 01 Date of Issue: 30/06/2016 C O N T E N T S 1 INTRODUCTION Purpose Scope Terminology 2 RESPONSIBILITIES Station head Competent Authorised Person Supervisors 3 PERSONNEL Specialists (personnel certified to carry out the work) 4 INSPECTION AND CERTIFICATION 5 HAND TRUCKS 6 FORK LIFT TRUCKS Operations Parking Operating Ar
the load by e.g. applying spreaders under the outriggers. Experiences at site and elsewhere have shown that paved areas are not necessarily having the loading capability as per design. Safe workload at lift radius will be derived from the selected Crane Load Chart for the calculated lift radius and boom length.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}