Transcription of PROCEDURE FOR MATERIAL HANDLING AND STORAGE
{{id}} {{{paragraph}}}
Note: Uncontrolled once printed Page 1 The Tata Power Company Ltd MATERIAL HANDLING and STORAGE PROCEDURE Document No. TPSMS/GSP/HAZM/003 REV 01 Date of Issue: 30/06/2016 Rev No. Reason for Revision Prepared By Checked By Approval by Rev 00 First release R&P Subcommittee D Kamath Vijay Chourey Rev 01 Standardization of PROCEDURE Navendra Singh (Group Head P Corp Safety.) Rajesh Sharma ( Head Corp Safety Operation) Vijay Chourey (Chief Corp Safety) PROCEDURE FOR MATERIAL HANDLING AND STORAGE Note: Uncontrolled once printed Page 2 The Tata Power Company Ltd MATERIAL HANDLING and STORAGE PROCEDURE Document No.
Capacity loading will be calculated by dividing the total weight with the safe workload at lift radius. It shall not exceed 85%. For capacity loading above 85% a lifting plan is required. No capacity loading above 100% shall be allowed, equal to 90% of load test. If Safe Load
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}