Transcription of PROCEDURE FOR MATERIAL HANDLING AND STORAGE - …
{{id}} {{{paragraph}}}
Note: Uncontrolled once printed Page 1 The Tata Power Company Ltd MATERIAL HANDLING and STORAGE PROCEDURE Document No. TPSMS/GSP/HAZM/003 REV 01 Date of Issue: 30/06/2016 Rev No. Reason for Revision Prepared By Checked By Approval by Rev 00 First release R&P Subcommittee D Kamath Vijay Chourey Rev 01 Standardization of PROCEDURE Navendra Singh (Group Head P Corp safety .) Rajesh Sharma ( Head Corp safety Operation) Vijay Chourey (Chief Corp safety ) PROCEDURE FOR MATERIAL HANDLING AND STORAGE Note: Uncontrolled once printed Page 2 The Tata Power Company Ltd MATERIAL HANDLING and STORAGE PROCEDURE Document No. TPSMS/GSP/HAZM/003 REV 01 Date of Issue: 30/06/2016 C O N T E N T S 1 INTRODUCTION Purpose Scope Terminology 2 RESPONSIBILITIES Station head Competent Authorised Person Supervisors 3 PERSONNEL Specialists (personnel certified to carry out the work) 4 INSPECTION AND CERTIFICATION 5 HAND TRUCKS 6 FORK LIFT TRUCKS Operations Parking Operating Areas Attachments General Operations Rough Terrain 7 CRANES 8 SIGNALS 9 GENERAL PRECAUTIONS 10 LIFTING ACCESSORIES Chains Fi
and will be available for inspection by Safety Advisors. 2.3 Supervisors Supervisors are responsible for ensuring that persons under their supervision who are involved in, or are within the area, where materials handling operations are being conducted: Are trained in the techniques required for the safe execution of their work.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}