PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: quiz answers

PROCEDURE FOR MATERIAL HANDLING AND STORAGE

Note: Uncontrolled once printed Page 1 The Tata Power Company Ltd MATERIAL HANDLING and STORAGE PROCEDURE Document No. TPSMS/GSP/HAZM/003 REV 01 Date of Issue: 30/06/2016 Rev No. Reason for Revision Prepared By Checked By Approval by Rev 00 First release R&P Subcommittee D Kamath Vijay Chourey Rev 01 Standardization of PROCEDURE Navendra Singh (Group Head P Corp Safety.) Rajesh Sharma ( Head Corp Safety Operation) Vijay Chourey (Chief Corp Safety) PROCEDURE FOR MATERIAL HANDLING AND STORAGE Note: Uncontrolled once printed Page 2 The Tata Power Company Ltd MATERIAL HANDLING and STORAGE PROCEDURE Document No.

Weight of hook block, slings and attachments shall be derived from crane load chart and tables for slings. Total weight is the sum of the weight of the load and weight of hook block, slings and attachment. Capacity loading will be calculated by dividing the total weight with the safe workload at lift radius. It shall not exceed 85%.

Loading..

Tags:

  Attachment, Safe, Material, Storage, Handling, Material handling and storage

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of PROCEDURE FOR MATERIAL HANDLING AND STORAGE

Related search queries