Transcription of PROII Academic Manual student - 國立中興大學
{{id}} {{{paragraph}}}
PRO/II Academic Manual 1 PRO/II Academic Manual student Edition PRO/II Academic Manual 2 License and Copyright Information The software described in this guide is furnished under a written agreement and may be used only in accordance with the terms and conditions of the license agreement under which you obtained it. The technical documentation is being delivered to you AS IS and Invensys Systems, Inc. makes no warranty as to its accuracy or use. Any use of the technical documentation or the information contained therein is at the risk of the user. Documentation may include technical or other inaccuracies or typographical errors.
Building the Process Flow Diagram The first step in any simulation, no matter how small or large, is to draw the process flow diagram. While there is a close correspondence between an actual flowsheet and its simulation flowsheet, there are some notable differences. These are: • Time dependencies • Combined units Time Dependencies
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}