Transcription of Requirements on piling plan submission
{{id}} {{{paragraph}}}
1Er Dr Yet Nai SongBuilding and Construction AuthorityRequirements on piling plan submissionUnder BC (Amendment) Act 2007 & Regulations 20082 Types of piling submissionsBored cast-in place pilesBarrettesGrouted micropiles3 Types of piling submissionsDriven pilesJacked-in piles4 Objective To help Qualified Persons who prepare the piling plans to comply with Requirements of BC (Amendment) Act 2007 & Regulations 20085 Overview1. submission checklist2. BC Regulations 10(2)3. SS CP4 : 20034. BCA / IES / ACES Advisory Note on Site investigation & Load test5. piling Annexes B, C, D6. Good practices in design & construction6(1) submission checklist7 submission plansendorsed by QP and reportsby QP and formsby QP and AC investigation report , endorsed & certified by a planshowing the layout and location of the site, boundary line and neighbouring buildings assessment report , where applicable (eg.)
IV. Site investigation report, endorsed & certified by a PE V. A plan showing the layout and location of the site, boundary line and neighbouring buildings VI. Impact assessment report, where applicable (eg. for foundations located within influence zone of sensitive structures, like MRT or CST tunnels) VII.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}