PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: dental hygienist

Residential Building Final

Inspection Checklist Residential Building Final July 2016. This Inspection Checklist reflects code requirements of the 2015 International Residential Code (IRC), 2015 Uniform Plumbing Code (UPC), 2014 National Electrical Code (NEC), and the 2015 International Fire Code (IFC). Please verify the following before calling for a Building Final inspection Permits and Plans Permit and approved plans are on site and accessible to the inspector. ( ). Permit information is correct (address, permit number, description of work, etc.) ( ). All other finals are approved. (R109) (Check with the local jurisdiction for required finals.). FEMA elevation certificate by licensed surveyor for construction in flood hazard areas.

Decks, stairs and walkways See Tip Sheets 1, 2, 3 & 5 for details. Verify that deck placement, setback, size and materials are per approved plans. Deck is positively attached and supports both lateral and live loads (40lb/sq.ft. minimum) R301.5 , R502.2. All deck material treated or naturally resistant to decay.

Loading..

Tags:

  Stair, Walkway

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Residential Building Final

Related search queries