RETAINING WALLINSTALLATION INSTRUCTIONS22 RETAINING WALL INSTALLATION INSTRUCTIONSThe following INSTALLATION instructionsapply to Anchor RETAINING wall productsthat feature a rear lip. Where there arevariations, the appropriate informationhas been noted. LEVELING PAD COMPACTIOND iagram 2 EXCAVATIOND iagram 1 CONSTRUCTION OF THE NEXT COURSED iagram 3 CORE FILLD iagram 4 STAKE OUT THE WALLHave a surveyor stake out the wall s placement. Verify the locations with the project for the leveling pad to the lines and grades shown on the approved plans and excavate enough soil behind the wall for the geosynthetic reinforcement material.
RETAINING WALL CONSTRUCTION DETAILS 26 These construction drawings feature step units. Caps or pavers can be used for treads. Check local building codes