Transcription of RETAINING WALL 22 INSTALLATION …
{{id}} {{{paragraph}}}
RETAINING WALLINSTALLATION INSTRUCTIONS22 RETAINING WALL INSTALLATION INSTRUCTIONSThe following INSTALLATION instructionsapply to Anchor RETAINING wall productsthat feature a rear lip. Where there arevariations, the appropriate informationhas been noted. LEVELING PAD COMPACTIOND iagram 2 EXCAVATIOND iagram 1 CONSTRUCTION OF THE NEXT COURSED iagram 3 CORE FILLD iagram 4 STAKE OUT THE WALLHave a surveyor stake out the wall s placement. Verify the locations with the project for the leveling pad to the lines and grades shown on the approved plans and excavate enough soil behind the wall for the geosynthetic reinforcement material. The trench for the leveling pad should be at least 12 inches wider than the block you areinstalling and 6 inches deeper than the height of the Diagram PADAn aggregate leveling pad is made of compactible base material of 3 4-inch minus (with fines).
RETAINING WALL INSTALLATION INSTRUCTIONS For more information visit www.anchorwall.com. RETAINING WALL INSTALLATION INSTRUCTIONS 23 FILTER FABRIC Diagram 5
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
INSTALLATION, INSTALLATION INFORMATION, AIR CONDITIONING INSTALLATION, AIR CONDITIONING INSTALLATION CERTIFICATION, Information, GENERAL INFORMATION INSTALLATION, CALIBER Bunk Wrap, CALIBER® Bunk Wrap Installation, Parker Hannifin, Assembly / Installation Parker Hannifin, FUEL PRESSURE GAUGE AND SENSOR