Transcription of Roof Mitigation Verification Statement
{{id}} {{{paragraph}}}
1 of 2 02/2021 _____ roof Mitigation Verification Statement Permit # _____ On or about _____ , I did personally inspect roof replacement work at (Address) Based upon the examination, I have determined that the following roof Mitigation measures were performed in accordance with Section 201 of the Hurricane Mitigation Retrofit Manual: 1. roof deck attachment and fasteners strengthened and corrected as required by Section 2. Secondary water barrier provided as required by section All associated Mitigation is in compliance with the Hurricane Mitigation Retrofit Manual (Based on ) or - roof secondary water barrier for existing structures with wood roof decks. Outside the High-Velocity Hurricane Zone: a) Underlayment shall comply with Section of the Florida Building code , Residential. Certification I certify that I am (Check one of the following): q Licensed Roofing Contractor q Licensed General, Residential, or Building Contractor Licensed q FS468 Building Inspector q Registered Architect or an Engineer in the State of Florida Duly authorized by the State of Florida or its county s municipalities to verify compliance with the Hurricane Mitigation Provisions of HB 7057, Section Florida Statutes.
All associated mitigation isin compliance with the Hurricane Mitigation Retrofit Manual (Based on 553.844 F.S.) or 706.7.2 - Roof secondary water barrier for existing structures with wood roof decks. Outside the High-Velocity Hurricane Zone: a) Underlayment shall comply with Section R905.1.1 of the Florida Building Code, Residential. Certification
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}