Roof Mitigation Verification Statement

1 of 2 02/2021 _____ roof Mitigation Verification Statement Permit # _____ On or about _____ , I did personally inspect roof replacement work at (Address) Based upon the examination, I have determined that the following roof Mitigation measures were performed in accordance with Section 201 of the Hurricane Mitigation Retrofit Manual: 1. roof deck attachment and fasteners strengthened and corrected as required by Section 2. Secondary water barrier provided as required by section All associated Mitigation is in compliance with the Hurricane Mitigation Retrofit Manual (Based on ) or - roof secondary water barrier for existing structures with wood roof decks. Outside the High-Velocity Hurricane Zone: a) Underlayment shall comply with Section of the Florida Building code , Residential. Certification I certify that I am (Check one of the following): q Licensed Roofing Contractor q Licensed General, Residential, or Building Contractor Licensed q FS468 Building Inspector q Registered Architect or an Engineer in the State of Florida Duly authorized by the State of Florida or its county s municipalities to verify compliance with the Hurricane Mitigation Provisions of HB 7057, Section Florida Statutes.

All associated mitigation isin compliance with the Hurricane Mitigation Retrofit Manual (Based on 553.844 F.S.) or 706.7.2 - Roof secondary water barrier for existing structures with wood roof decks. Outside the High-Velocity Hurricane Zone: a) Underlayment shall comply with Section R905.1.1 of the Florida Building Code, Residential. Certification

Tags:

  Code, Verification, Testament, Roof, Mitigation, Sini, Roof mitigation verification statement

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Roof Mitigation Verification Statement

1 1 of 2 02/2021 _____ roof Mitigation Verification Statement Permit # _____ On or about _____ , I did personally inspect roof replacement work at (Address) Based upon the examination, I have determined that the following roof Mitigation measures were performed in accordance with Section 201 of the Hurricane Mitigation Retrofit Manual: 1. roof deck attachment and fasteners strengthened and corrected as required by Section 2. Secondary water barrier provided as required by section All associated Mitigation is in compliance with the Hurricane Mitigation Retrofit Manual (Based on ) or - roof secondary water barrier for existing structures with wood roof decks. Outside the High-Velocity Hurricane Zone: a) Underlayment shall comply with Section of the Florida Building code , Residential. Certification I certify that I am (Check one of the following): q Licensed Roofing Contractor q Licensed General, Residential, or Building Contractor Licensed q FS468 Building Inspector q Registered Architect or an Engineer in the State of Florida Duly authorized by the State of Florida or its county s municipalities to verify compliance with the Hurricane Mitigation Provisions of HB 7057, Section Florida Statutes.

2 I also certify that I personally inspected the premises at the location address listed above on the date of this Statement . In my professional opinion, based on my knowledge, information and belief, I certify that the above statements are true and correct. Signature: _____ License #:_____ Date: _____ Phone #:_____ Please upload the completed document to the permit record in the HillsGovHub portal. 2 of 2 02/2021 Re- roof Inspection Information roof Mitigation If more than 25% of the total roof area or roof section of any building or structure is replaced or recovered in any 12 month period, the entire roof system or section must conform to current codes. Inspectors will check that roof attachment/s are strengthened and corrected as required per Hurricane Mitigation Retrofit Manual. Roofing Contractor can request a Progress Check inspection or can schedule a virtual inspection and send in supporting Pictures/Videos.

3 If no Progress Check inspection has been made by a Hillsborough County Building Inspector, the contractor must have a roof Mitigation Verification Statement filled out and uploaded through HillsGovHub before final inspection is requested. The purpose of this Verification Statement is to certify portions of the repairs, upgrades, and dry-ins which can no longer be viewed by the inspector. Homeowners installing their own roofing must either schedule a Progress Check inspection by the County inspector or have inspections performed and certified with the roof Mitigation Verification Statement by a Licensed Roofing Contractor, Licensed General Building Residential Contractor, a Licensed FS486 Building Inspector and/or a Registered Architect or Engineer in the State of Florida. This form will then need to be uploaded through HillsGovHub to the documents under the permit record. Final After the Progress Check inspections are performed or the roof Mitigation Verification Statement has been uploaded through HillsGovHub, a final roof inspection can be performed.