PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bankruptcy

Safety at Alcoa – Programs that Work - ETEBA

Safety at Alcoa Programs that work Oak Ridge Business Safety Forum 1 December 11, 2013 Metrics Lagging Indicators 2 TRDARTF atality Prevention Process 3 Dept Safety Committees Review Topic and Physically Verify LOP are in Place Rigging Safety Hazard Dropped Load, body part crushed by load Layers of Protection Hierarchy of Controls All personnel responsible for rigging loads must attend rigging training Administrative Inspect all sling equipment before each use Administrative Understand load capacity and select the right type of rigging equipment (wire rope, chain .)and correct capacity Administrative Determine the center of gravity of load and apply rigging so each leg carries an equal share of the load Administrative Do not position hands and fingers between sling and load or load and fixed object Administrative Do not stand or work in the VDZ Administrative Use a spotter, hand signals or other means to clearly communicate load movement Administrative Identify operator work zones (signs/paint floor) that are clear of drop zone or flight path Warning D

Stop Criteria are pre-determined performance modes, triggers, conditions, or outcomes of systems, processes or tasks Relate Back to the Worst Credible

Loading..

Tags:

  Programs, Safety, That, Work, Aalco, Safety at alcoa programs that work

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Safety at Alcoa – Programs that Work - ETEBA

Related search queries