Transcription of SAMPLE CONSTRUCTION SITE LOG BOOK
{{id}} {{{paragraph}}}
APPENDIX F. CONSTRUCTION SITE INSPECTION. AND MAINTENANCE LOG BOOK. STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM FOR CONSTRUCTION . ACTIVITIES. SAMPLE CONSTRUCTION SITE LOG BOOK. Table of Contents I. Pre- CONSTRUCTION Meeting Documents a. Preamble to Site Assessment and Inspections b. Pre- CONSTRUCTION Site Assessment Checklist II. CONSTRUCTION Duration Inspections a. Directions b. Modification to the SWPPP. November 2016 Page New York State Standards and Specifications For erosion and sediment control I. PRE- CONSTRUCTION MEETING DOCUMENTS. Project Name _____. Permit No. _____ Date of Authorization _____. Name of Operator _____.
5) Inspect all erosion and sediment control practices and record all maintenance requirements such as verifying the integrity of barrier or diversion systems (earthen berms or silt fencing) and containment systems (sediment basins and sediment traps). Identify any evidence of rill or gully
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Stormwater Management and Sediment and Erosion, Sediment, Erosion control, Stormwater management and sediment and erosion control, Buffer Variance Procedures and Criteria, Erosion, Control, DHEC Stormwater BMP Handbook Sediment, Erosion and Sedimentation on Construction Sites, Sediment control, Pond