Transcription of SAMPLE CONSTRUCTION SITE LOG BOOK
{{id}} {{{paragraph}}}
APPENDIX F. CONSTRUCTION SITE INSPECTION. AND MAINTENANCE LOG BOOK. STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM FOR CONSTRUCTION . ACTIVITIES. SAMPLE CONSTRUCTION SITE LOG BOOK. Table of Contents I. Pre- CONSTRUCTION Meeting Documents a. Preamble to Site Assessment and Inspections b. Pre- CONSTRUCTION Site Assessment Checklist II. CONSTRUCTION Duration Inspections a. Directions b. Modification to the SWPPP. November 2016 Page New York State Standards and Specifications For Erosion and Sediment Control I. PRE- CONSTRUCTION MEETING DOCUMENTS. Project Name _____. Permit No. _____ Date of Authorization _____. Name of Operator _____. Prime Contractor _____. a. Preamble to Site Assessment and Inspections The Following Information To Be Read By All Person's Involved in The CONSTRUCTION of Stormwater Re- lated Activities: The Operator agrees to have a qualified inspector1 conduct an assessment of the site prior to the commence- ment of construction2 and certify in this inspection report that the appropriate erosion and sediment controls described in the SWPPP have been adequately installed or implemented to ensure overall preparedness of the site for the commencement of CONSTRUCTION .
2 “Commencement of construction” means the initial removal of vegetation and disturbance of soils associated with clearing, grading or excavating activities or other construction activities. 3 “Final stabilization” means that all soil-disturbing activities at the site have been completed and a uniform, perennial
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}