SECTION 3. EROSION CONTROL - PART 1. RUNOFF CONTROL . CONTENTS. Page List of Tables and Figures Scope and Discussion .. Check Dam .. Construction Ditch .. Dewatering Sump Pit .. Diversion .. Earth Dike .. Flow Diffuser .. Flow Spreader .. Grade Stabilization Structure .. Grassed Waterway .. Lined Waterway .. Paved Flume .. Perimeter Dike/Swale .. Pipe Slope Drain .. Rock Outlet Protection .. Storm Drain Diversion .. Subsurface Drain .. Water Bar .. SECTION prepared by: Donald W. Lake Jr., PE, CPESC, CPSWQ. Former State Conservation Engineer USDA Natural Resources Conservation Service Syracuse, New York Adjunct Assistant Professor State University of New York, College of Environmental Science and Forestry List of Tables and Figures Table Title Page Diversion Maximum Permissible Design Velocities Table.
Remove sediment accumulated behind the dam as needed to allow channel to drain through the stone check dam and prevent large flows from carrying sediment over the dam. November 2016 Page 3.2 New York State Standards and Specifications For Erosion and Sediment Control
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Sediment control, Erosion control, Control, Erosion, Stormwater Management and Sediment and Erosion, Sediment, Stormwater management and sediment and erosion control, Standard, Erosion and Sediment Control, Turbidity: Description, Impact on Water Quality, Chapter 13 - SEDIMENT MEASUREMENTS, DIVISION 1 00 -- GENERAL, New Hampshire, STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES