Transcription of “SECTION 304 - SUBBASE COURSE
{{id}} {{{paragraph}}}
III - 1 Page 3-6, line 17; to page 3-9, line 18; delete entirely and replace with the following: section 304 - SUBBASE COURSE304-1 DESCRIPTION General. The work consists of furnishing, placing and compacting a SUBBASE COURSE inconformity with the lines, grades, thicknesses and typical sections shown on the plans, or as determinedby field conditions and ordered in writing by the Optional Types. Unless otherwise stated in the plans or in the proposal, select any of thethree (3) options as follows:10 Option construction consisting of two (2) separate layers of Type 4 and Type 3 construction consisting of a single layer of Type 1 SUBBASE COURSE .
the subbase has been disturbed by frost action, recompact the subbase where directed by the Engineer. 5 304-3.04 Traffic and Contamination. The movement of highway traffic over the final surface of the subbase may be permitted at locations designated by, and under such restrictions as ordered by the
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}