Transcription of “SECTION 304 - SUBBASE COURSE - New York State ...
{{id}} {{{paragraph}}}
III - 1 Page 3-6, line 17; to page 3-9, line 18; delete entirely and replace with the following: section 304 - SUBBASE COURSE304-1 DESCRIPTION General. The work consists of furnishing, placing and compacting a SUBBASE COURSE inconformity with the lines, grades, thicknesses and typical sections shown on the plans, or as determinedby field conditions and ordered in writing by the Optional Types. Unless otherwise stated in the plans or in the proposal, select any of thethree (3) options as follows:10 Option construction consisting of two (2) separate layers of Type 4 and Type 3 construction consisting of a single layer of Type 1 SUBBASE COURSE .
When the moisture content is within the limits for proper compaction, compact the material in accordance with the requirements of §203-3.12 , Compaction. Density tests are not required for the acceptance of these courses. When a subbase course has been placed, but subsequent paving operations have been delayed so that
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}