Transcription of Section 8 - Metering - PECO
{{id}} {{{paragraph}}}
Type of Standard Meter Standard Criteria Reference Notes Charges Property Location(s) Drawings and Policies Residential, Outdoor, Accessible for Residential Single Homes Front or Front-maintenance andMeterSide of manual meterInstallationstructure readingDrawings, Not subject toFigures infuture damage orSection Starting Readable bywith FigureAutomatic Reading System Adequateclearance/spacingof equipmentResidential, Outdoor, Same as above ResidentialMultiple Front or Front-MeterMeters ( Side of Installationtwins) structure Drawings,Figures inSection 8. Startingwith Residential Outdoor, Same as above Residential Location of outdoorCustomers must pay the Condominiums Front or Front-Meteror indoor-gangedcost of Company approved (individual Side of Installationmeter must beindoor meter locations that Metering ) structure Drawings,approved by PECO require additional Figures induring in order to OR Section 8.
during design. equipment in Approved • Use of ganged order to ensure indoor ganged meters may change sufficient RF meter location the installation, communications. maintenance, and ownership responsibilities of some facilities. These particulars should be discussed and understood by the builder prior to construction.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}