PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: marketing

Selective Coordination - Cooper Industries

90 2005 Cooper BussmannFuse CurvesThe figure to the right illustrates the time-current characteristic curves for twosizes of time-delay, dual-element fuses in series, as depicted in the one-linediagram. The horizontal axis of the graph represents the RMS symmetricalcurrent in amps. The vertical axis represents the time, in example:Assume an available fault current level of 1000A RMS symmetrical on the load side of the 100A fuse. To determine the time it wouldtake this fault current to open the two fuses, first find 1000A on the horizontalaxis (Point A), follow the dotted line vertically to the intersection of the totalclear curve of the 100A time-delay dual-element fuse (Point B) and the minimum melt curve of the 400A time-delay dual-element fuse (Point C).

90 ©2005 Cooper Bussmann Fuse Curves The figure to the right illustrates the time-current characteristic curves for two sizes of time-delay, dual-element fuses in series, as depicted in the one-line

Loading..

Tags:

  Industreis, Selective, Cooper industries, Cooper, Coordination, Selective coordination

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Selective Coordination - Cooper Industries

Related search queries