PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: stock market

September 2013 - INOGATE

September 2013 1 Contents commissioning of pipeline Activities 2 commissioning Procedures These Procedures covers the following: Pre- commissioning , which covers all activities and approvals necessary to allow purging with gas and pressurizing to normal operating pressure to commence. Pipeline preservation, in case gas-initiation of the pipeline is performed later than six months after the installations are completed the pipeline is preserved. commissioning of dry pipelines. The criteria for being considered a dry pipeline are as follows: Dew point temperature must be < - 20 C measured at atmospheric pressure. Over-pressure following sealing of the lines must be at least I barg. The acceptable minimum standard during the whole period of preservation is a dew point temperature of - I0 C. commissioning of wet pipelines. Wet pipelines are considered those that are not met the previous criteria 3 PRE- commissioning ACTIVITIES On substantial completion of construction activities, Contractor mobilizes its commissioning team to initiate pre- commissioning activities in a phased manner.

The pre-commissioning phase includes three main types of field activities: a) Systematic conformity checks, carried out on each item of equipment or component, such as pressure gauges, cables, etc., to verify visually the condition of …

Loading..

Tags:

  2013, September, Commissioning, September 2013

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of September 2013 - INOGATE

Related search queries