September 2013 - INOGATE

September 2013 1 Contents Commissioning of pipeline Activities 2 Commissioning Procedures These Procedures covers the following: Pre-commissioning, which covers all activities and approvals necessary to allow purging with gas and pressurizing to normal operating pressure to commence. Pipeline preservation , in case gas-initiation of the pipeline is performed later than six months after the installations are completed the pipeline is preserved. Commissioning of dry pipelines. The criteria for being considered a dry pipeline are as follows: Dew point temperature must be < - 20 C measured at atmospheric pressure . Over- pressure following sealing of the lines must be at least I barg. The acceptable minimum standard during the whole period of preservation is a dew point temperature of - I0 C. Commissioning of wet pipelines. Wet pipelines are considered those that are not met the previous criteria 3 PRE-COMMISSIONING ACTIVITIES On substantial completion of construction activities, Contractor mobilizes its commissioning team to initiate pre-commissioning activities in a phased manner.

Commissioning Procedures These Procedures covers the following: Pre-commissioning, which covers all activities and approvals necessary to allow purging with gas and pressurizing to normal operating pressure to commence. Pipeline preservation, in case gas-initiation of the pipeline is performed later than six months after the installations …

Loading..

Tags:

  Pressure, 2013, Preservation, September, September 2013

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of September 2013 - INOGATE

Related search queries