Specifications and Installation Guide for Underground Service to Residential Developments June 2010 Western Massachusetts Electric TABLE OF CONTENTS I. II. General a. , 5 b. Code c. Environmental d. Customer III. Division Responsibility a. The b. WMECO IV. Construction V. Construction Requirements a. Layout and b. , 7 c. VI. VII. VIII. Single-Phase mounted Transformer IX. Secondary Vault (Hand hole)..9, 10 X. Riser XI. XII. Street XIII. Other Reviewed and Updated June 2010 2 Required Lead Times The following lead times should be adhered to in order to facilitate timely completion of your proposed project Design lead time: 8 weeks After the Company receives all required materials (town approved plot plan, loads, easement information, street l)
A minimum of two copies of the approved Planning and Zoning development map showing property lines only, total number of house lots proposed, their locations and footprint, ... that work areas in which the Company is to perform installation or maintenance, are free of preexisting contamination by hazardous wastes or materials as defined in the ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
GUIDELINES FOR THE PLANNING, INSTALLATION, Guidelines for the Planning, Installation and Maintenance of, Planning, Installation, Guidelines, Maintenance, And Maintenance, USPS, Architectural Heritage Protection Guidelines, Architectural heritage protection, BOILER, GUIDELINES FOR TEMPORARY SHORING, Installation Rules, GUIDELINES FOR THE CONSTRUCTION OF EARTH-FILL, GUIDELINES FOR THE CONSTRUCTION OF EARTH-FILL DAMS, Construction of earth-fill dams